A power surge is when an unusually high voltage occurs in an electrical system for a short period. It may also be referred to as a transient surge because it involves a transient wave of voltage, current or power which usually occurs between the normal waves of voltage. The over voltage can be additive or subtractive with positive or negative polarity lasting less than a half-cycle, or at little as 50 microseconds but surges can reach 6000 Volts and 3000Amps which can cause damage.
Power surges often occur after power cuts or blackouts as systems are reinstalled or turned on again. Lightening strikes can cause power cuts but can also cause power surges as the systems absorb the excess electrical power of the lightening strike, which can damage equipment plugged into the circuit. Other common causes of power surges are faulty wiring and when systems are overloaded or drawing too much power.
Occurrences where systems draw too much power can be localised to individual buildings where for example too many pieces of equipment are plugged into the same socket, drawing too much power which can cause damage or in some cases fire. These events can also occur on a wider scale such as for example during what is known as TV pickup, which describes the phenomenon of many people demanding power at the same time, which might happen during commercial TV breaks when viewers all put the kettle on at the same time. One example of this occurred at the end of the FIFA World Cup semi-final after a penalty shoot-out between England v West Germany in 1990 when the UK demand at that point was 2800 megawatts.
Common methods exist to deal with power surges, most of which aim to earth any excess power from a lightening bolt safely to the ground rather than through an electrical system, many of which are written into installation guidance or recommended by the building regulations such as lightening protection systems. Other practical measures to avoid damage to individual equipment during a power surge that occurs after a power cut (or during a storm with likely lightening bolts) include unplugging equipment from those circuit, thus removing the risk to individual appliances or earthing individual appliances within the circuit.
[edit] Related articles on Designing Buildings
Featured articles and news
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.
UKCW London to tackle sector’s most pressing issues
AI and skills development, ecology and the environment, policy and planning and more.
Managing building safety risks
Across an existing residential portfolio; a client's perspective.
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.


























Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.